| :: Home | :: Calculators | :: Utilities | :: Links | :: Contact Us | Updated: 30-Dec-2008 |
|
Below is the list of data range limits for EnCalcGU. These can also be found by hovering with the mouse over each data box, they will also be displayed in the error pop up when data is outside the allowed limits and the Calculate button is clicked. Limit Values Rate 1 (Cost per KWHr): 0.01 - 0.99 Rate 2 (Cost per KWHr): 0.01 - 0.99 (No Entry or 0 is also OK ) Fixed Charge (per quarter): 5 - 100 (No Entry or 0 is also OK ) After BP (break point between Rate 1 and Rate 2): 10-1000 (No Entry or 0 is also OK ) Conversion Factor: 1.0 - 10.0 Calorific Value: 10.0 - 100.0 Volume Conversion Factor: 0.800000 to 1.200000 VAT (or Tax rate ($)): 0 - 50 Predict (Period in quarters): 0 - 4 (No Entry or 0 means no prediction) CO2 Conversion Factor (Kg/KWHr): 0.05 - 1.0 Normal Rate 2 and After BP must both be set or 0
Meter Readings Date a: Must be a valid date between 01-Jan-2000 and 31-Dec-2015 Date b: Must be a valid date between 01-Jan-2000 and 31-Dec-2015 Normal Rate Reading a: 1 - 999900 Normal Rate Reading b: 11 - 999999 Notes: Up to 75 characters Date a must be at least 3 days before Date b Meter Reading 2 must be at least 10 more than Meter Reading 1 |
|||||||
| Legal Disclaimer | Home | Calculators | Utilities | Links | Contact us | Privacy Policy |
| Site History | Copyright © 2006-2009 A.J Shadlock. All Rights Reserved. Designed by Nina Flowers | Site Map |